2002
DOI: 10.1016/s0968-090x(02)00005-0
|View full text |Cite
|
Sign up to set email alerts
|

Evaluation of ramp control algorithms using microscopic traffic simulation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
36
0

Year Published

2009
2009
2019
2019

Publication Types

Select...
4
2
1

Relationship

0
7

Authors

Journals

citations
Cited by 57 publications
(36 citation statements)
references
References 9 publications
0
36
0
Order By: Relevance
“…Similarly, it can be seen from the results in Tables 4 and 5 that the traffic flow gradually transfers to the paths with less travel time which is due to the fact that the impact of travel time on the path choice is considered. This also shows that the network traffic flow evolution model (25) has the ability to simulate the evolution process of network traffic flow with multiple user class.…”
Section: Results Analysis It Is Not Difficult To See From Thementioning
confidence: 74%
See 3 more Smart Citations
“…Similarly, it can be seen from the results in Tables 4 and 5 that the traffic flow gradually transfers to the paths with less travel time which is due to the fact that the impact of travel time on the path choice is considered. This also shows that the network traffic flow evolution model (25) has the ability to simulate the evolution process of network traffic flow with multiple user class.…”
Section: Results Analysis It Is Not Difficult To See From Thementioning
confidence: 74%
“…* to network traffic flow evolution model (25) and 0 < 0 ‖ ‖ < 2, then the unique solution * is asymptotically stable.…”
Section: Theorem 3 If There Exists a Unique Solutionmentioning
confidence: 96%
See 2 more Smart Citations
“…The efficiency of RM in improving motorway throughputs, environmental quality and travel time savings have been verified by a number of experimental and simulation studies (e.g. [18][19]). However, system-wide efficiency benefits of RM might be obtained at the cost of some motorway users e.g.…”
Section: Equity In Ramp Meteringmentioning
confidence: 87%