Evaluation Of Residual Materials With Model Construction Waste Management

Abstract: In development and renovation of Mawar Sharon Church Surabaya lot of material left over and not used anymore, due to frequent damages to the contractor and the grounds look untidy as the lack of collection points the rest of the material, causing costs to the process of disposal of waste material and cause harm very much.The goal is to determine the potential occurrence of residual material. The method used is the Pareto method for determining the material to be observed in determining the most material waste.… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Volume of work Productivity of work x Make sequencing and scheduling with the PDM method. By using the Microsoft Project application The waste analysis from the results of direct observation and interviews with the site manager of the Japfa Office Building Daan-Mogot project, can be calculated using the following formula [15]:…”
Section: Duration Of Work =mentioning
confidence: 99%
“…Volume of work Productivity of work x Make sequencing and scheduling with the PDM method. By using the Microsoft Project application The waste analysis from the results of direct observation and interviews with the site manager of the Japfa Office Building Daan-Mogot project, can be calculated using the following formula [15]:…”
Section: Duration Of Work =mentioning
confidence: 99%