Evaluation of the latest Spanish grid code requirements from a PV power plant perspective

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(1 citation statement)
references
References 30 publications
0
0
0
Order By: Relevance
“…Usually, it is limited to a maximum ramping rate value that differs depending on the country: in [105], a comprehensive review about this parameter is provided according to national grid codes. In [116,117], the compliance of real PV power plants with the technical requirements established in the new Spanish grid code is evaluated; both papers suggest the practical applicability and compliance of the aggregated PV units with the considered prescriptions. However, in the literature, the computation of the ramping rate is not uniquely defined, and several calculation methods are proposed: in [118], it is obtained as the change in the output power between two successive time instances; in [119], it is obtained as the difference between the maximum and the minimum values measured during a specific time window; while in [120], it is obtained as the difference between consecutive boxcar averaged values whose width is a specific time window.…”
Section: Literature On Technical Indexes Of Flexible Distributed Ener...mentioning
confidence: 99%
“…Usually, it is limited to a maximum ramping rate value that differs depending on the country: in [105], a comprehensive review about this parameter is provided according to national grid codes. In [116,117], the compliance of real PV power plants with the technical requirements established in the new Spanish grid code is evaluated; both papers suggest the practical applicability and compliance of the aggregated PV units with the considered prescriptions. However, in the literature, the computation of the ramping rate is not uniquely defined, and several calculation methods are proposed: in [118], it is obtained as the change in the output power between two successive time instances; in [119], it is obtained as the difference between the maximum and the minimum values measured during a specific time window; while in [120], it is obtained as the difference between consecutive boxcar averaged values whose width is a specific time window.…”
Section: Literature On Technical Indexes Of Flexible Distributed Ener...mentioning