2014
DOI: 10.1016/j.ijproman.2013.06.003
|View full text |Cite
|
Sign up to set email alerts
|

Examining the influence of participant performance factors on contractor satisfaction: A structural equation model

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

2
87
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
5
2
1

Relationship

0
8

Authors

Journals

citations
Cited by 113 publications
(89 citation statements)
references
References 40 publications
2
87
0
Order By: Relevance
“…Construction project performance has been reported by literature with the following critical problems being found: poor quality, over budget, missing timeliness, unsafe construction and client dissatisfaction [1][2][3][4]. The factors that potentially influence the success or failure of construction projects must be identified to improve project performance.…”
Section: Introductionmentioning
confidence: 99%
“…Construction project performance has been reported by literature with the following critical problems being found: poor quality, over budget, missing timeliness, unsafe construction and client dissatisfaction [1][2][3][4]. The factors that potentially influence the success or failure of construction projects must be identified to improve project performance.…”
Section: Introductionmentioning
confidence: 99%
“…Appling Q-methodology in the construction and engineering projects, Suprapto et al (2015) attempted to reconstruct project practitioner's prospective concerning collaborative relationships between owner and contractors. Xiong et al (2014) Cheng (2011) utilized a BLDPP to formulate a sealed-bid, multi-issue, and multi-sourcing reverse auction problem in negotiation between a buyer and a set of suppliers. In the proposed model, the buyer is assumed the leader (i.e., the upper level decision maker) and the suppliers are assumed as independent followers (i.e., lower level decision makers).…”
Section: Survey On Client and Contractors Interactionsmentioning
confidence: 99%
“…According to Ullman (2006) SEM is a collection of statistical techniques that allows a set of relations between one or more independent variables (IVs), either continuous or discrete, and one or more dependent variables (DVs), either continuous or discrete, to be examined. The variables can be latent ones, which are not directly observable due to their abstract manner, or measured ones, which contain objective facts that can be evaluated directly such as rating questions in a questionnaire (Xiong et al, 2014). Project owners' motivation, their commitment and delivery performance are latent variables in this study, and they have their respective measured variables.…”
Section: Objective 4: Evaluate and Provide Empirical Support For The mentioning
confidence: 99%
“…The confirmatory factor analysis (CFA) was carried out to validate the speculated measurement constructs for motivation, owner commitment and delivery performance (TDP & SDP) (Table 7- 4) thereby providing foundation for the SEM (Xiong, et al, 2014). The skewness and kurtosis coefficients of the data were calculated in order to assess the multivariate normality.…”
Section: Confirmatory Factor Analysismentioning
confidence: 99%
See 1 more Smart Citation