2020
DOI: 10.1080/14719037.2019.1708439
|View full text |Cite
|
Sign up to set email alerts
|

Examining the institutional drivers of public-private partnership (PPP) market performance: a fuzzy set qualitative comparative analysis (fsQCA)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

4
49
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 62 publications
(53 citation statements)
references
References 44 publications
4
49
0
Order By: Relevance
“…But caveat must be taken into consideration in adopting PPP as market reliability, political will, and social will, as well as regulatory regimes, may be necessary but not sufficient conditions for PPP market performance. The lack of market transparency appears also to be far less problematic for PPP market performance than what has been assumed previously (Casady, 2020). In another study, it shows that successful PPP projects are predicated on well-designed contracts, a stable economy, good governance, and sound regulations, and a high level of institutional capacity to handle PPPs (Deep, 2019).…”
Section: Introductionmentioning
confidence: 90%
“…But caveat must be taken into consideration in adopting PPP as market reliability, political will, and social will, as well as regulatory regimes, may be necessary but not sufficient conditions for PPP market performance. The lack of market transparency appears also to be far less problematic for PPP market performance than what has been assumed previously (Casady, 2020). In another study, it shows that successful PPP projects are predicated on well-designed contracts, a stable economy, good governance, and sound regulations, and a high level of institutional capacity to handle PPPs (Deep, 2019).…”
Section: Introductionmentioning
confidence: 90%
“…This process allows the public sector to solicit, technically evaluate, and procure USPs in a systematized manner which offers serious and qualified private sector partners a competitive platform to submit innovative ideas. Additionally, this structured application process goes a long way to appease any concerns the public may have about the corruption of traditional procurements, thereby enhancing the legitimacy of such undertakings (Casady 2020;Casady et al 2020). By introducing qualification criteria and specific project needs, PennDOT has also introduced measures that safeguard its institutional capacity, prioritize/align its strategic objectives, and strengthen the VfM case for PPPs (Baxter 2020c).…”
Section: Adopting Streamlined Usp Procedures: the Case Of Penndotmentioning
confidence: 99%
“…In this COVID-19 epoch, new forms of public-private partnerships (PPPs) are being contemplated by political, economic, and healthcare leaders, both philanthropic and conventional contractual arrangements between the public and private sector that bundle multiple phases of the project lifecycle-i.e. design, construction, financing, operations, and maintenance (WBG 2017a;Casady et al 2018Casady et al , 2020Casady 2020). While the news is filled with uplifting stories of corporations deploying their resources and supply chains to address systemic shortages in personnel protective equipment (PPE), medical devices, and other healthcare capacity, there remains a lack of coordinated and strategic initiatives for formal, longterm partnerships with the private sector (Baxter 2020a).…”
Section: Introductionmentioning
confidence: 99%
“…Naturally, the utility of any PPP triage framework for decision making, goal prioritization, and resource allocation will depend on a country's institutional capacity and surrounding PPP-enabling environment [19,20]. Governments should thus consider launching and sustaining a crisis command center to effectively triage PPP projects [14].…”
Section: Additional Considerations For Ppp Triage Actionsmentioning
confidence: 99%