2011
DOI: 10.1016/j.enpol.2011.08.045
|View full text |Cite
|
Sign up to set email alerts
|

Examining the Small Renewable Energy Power (SREP) Program in Malaysia

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
39
0

Year Published

2013
2013
2024
2024

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 89 publications
(46 citation statements)
references
References 17 publications
0
39
0
Order By: Relevance
“…In line with that, Malaysia adopted the Small Renewable Energy Power Program (SREP) in year 2001 to further boost the development of RE. However, unsatisfactory results were obtained as the SREP scheme failed to increase the share of RE in the national power generation mix by 2010 [2]. After that, in 2011, a national energy policy known as Renewable Energy Act 2011 (Act 725) was introduced and passed in the Malaysian parliament for implementation [3,4].…”
Section: Introductionmentioning
confidence: 99%
“…In line with that, Malaysia adopted the Small Renewable Energy Power Program (SREP) in year 2001 to further boost the development of RE. However, unsatisfactory results were obtained as the SREP scheme failed to increase the share of RE in the national power generation mix by 2010 [2]. After that, in 2011, a national energy policy known as Renewable Energy Act 2011 (Act 725) was introduced and passed in the Malaysian parliament for implementation [3,4].…”
Section: Introductionmentioning
confidence: 99%
“…in the palm oil industry; a majority of people would be expected to only have partial understanding in advanced boiler technology [5]. Past involvements in countries such as Germany and China highlighted that in spite of the application of standard PM methodology in Germany, subsequent result was found to be non-satisfactory [28].…”
Section: A Integration Of Project Management and Renewable Energy Pomentioning
confidence: 99%
“…However, barriers such as unrealistic expectations, communication barriers, and a lack of public awareness and support have hindered successful implementation of these policies [5]. The objective for this project is not only to provide RE policy formulation guidance for policymakers, since the deployment of RE contributes considerably to the economy [6], but to also recommend project management (PM) methodologies in the RE industry especially during the implementation of RE policies [7].…”
mentioning
confidence: 99%
“…Most of the existing studies focus on common issues that impede the growth of the renewable energy industry in Malaysia, including a recent publication that examines the overall performance of the SREP [7]. Hence, this paper aims to fill that gap.…”
Section: Introductionmentioning
confidence: 99%