2011
DOI: 10.1080/03610926.2011.562783
|View full text |Cite
|
Sign up to set email alerts
|

Expected Cost for Continuous Sampling Plans

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
4
0
4

Year Published

2016
2016
2022
2022

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(8 citation statements)
references
References 8 publications
0
4
0
4
Order By: Relevance
“…It can be seen from Figure 1(b) that only the inspection scheme ( , ) can meet the inequality (11) when ≤ . Thus, the inspection scheme ( , ) is the sole scheme which can simultaneously satisfy the two inequalities (10) and (11), named the optimal scheme.…”
Section: Determination Of Parameters For the Quality Controlmentioning
confidence: 99%
See 2 more Smart Citations
“…It can be seen from Figure 1(b) that only the inspection scheme ( , ) can meet the inequality (11) when ≤ . Thus, the inspection scheme ( , ) is the sole scheme which can simultaneously satisfy the two inequalities (10) and (11), named the optimal scheme.…”
Section: Determination Of Parameters For the Quality Controlmentioning
confidence: 99%
“…The scheme ( , ) can achieve the conforming outgoing quality < AOQL with a smaller inspection workload than for an in-control process with < and = AOQL under the inspection capability limit for an in-control process with = . The values of the parameters and cannot be easily achieved with inequalities (10) and (11). Li et al [38] proposed the formulas to solve the parameters of the specified AOQL contour scheme for the specified .…”
Section: Determination Of Parameters For the Quality Controlmentioning
confidence: 99%
See 1 more Smart Citation
“…Those models are merely based on economic considerations. Chou (2002, 2003) and Eleftheriou and Farmakis (2011) suggested various extensions of Cassady et al'…”
Section: Introductionmentioning
confidence: 99%
“…Κεφάλαιο 5 Μέθοδοι οικονομικής αποτίμησης σχεδίων συνεχούς δειγματοληψίας ται η επέκταση της εργασίας των Eleftheriou and Farmakis (2011a) σε ένα γενικευμένο οικονομικό μοντέλο συνεχούς δειγματοληψίας, όπου με καινοτόμο τρόπο λαμβάνονται υπόψη σχεδόν όλοι οι παράγοντες, ενδογενείς ή εξωγενείς που μπορούν να ποσοτικοποιηθούν. O Cassady (2000) ανέπτυξε το οικονομικό μοντέλο που περιγράφεται στην παρούσα παράγραφο επιχειρώντας να αποδείξει θεωρητικά την ισχύ του κανόνα kp του Deming στην περίπτωση του CSP-1 (βλέπε παράγραφο 4.2.4) με δεδομένο ότι η υπό μελέτη διεργασία βρίσκεται σε κατάσταση στατιστικού ελέγχου.…”
unclassified