“…To avoid MI specification problems due to the ECR-R length, and in line with past studies, parcelling was applied (Mastrotheodoros et al, 2015). The itemto-construct balance, where high and low factor loading items are equally distributed across parcels, was adopted (Mastrotheodoros et al, 2015). Thus, the problematic items were "split" along with high-loadings items in six parcels (3 items each) per factor-subscale (total 12 parcels; see Table 2).…”