Abstract:In order to increase the productivity and reliability of a hydraulic-powered loader crane, according to the normative-technical documentation regulating the safe operation of multi-link cranes, it is allowed to combine movements with the simultaneous movement of several links of the boom system. As a result, the paper considers a technique for conducting experimental studies in the plane of changing the boom system of a loader crane with a load. Experimental studies were carried out under the condition of simu… Show more
Set email alert for when this publication receives citations?
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.