2022
DOI: 10.1016/j.engstruct.2022.115021
|View full text |Cite
|
Sign up to set email alerts
|

Experimental studies on seismic performance of socket connections with shear keys and inner and outer filled reinforced concrete

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2023
2023
2025
2025

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 17 publications
(2 citation statements)
references
References 27 publications
0
2
0
Order By: Relevance
“…[1][2][3] Nowadays, there are three commonly used connection methods of accelerated bridge construction technology, namely, lap-spliced connection, [4][5][6] sleeve connection, [7][8][9] and socket connection. [10][11][12][13][14][15] The lap-spliced connection as a wet joint has been widely used in practical engineering. Wang et al 4 investigated the seismic performance of the precast piers with pocket connections using noncontact lap-spliced bars, and found that the bar bond length of five times the diameter could well guarantee the anchorage performance.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…[1][2][3] Nowadays, there are three commonly used connection methods of accelerated bridge construction technology, namely, lap-spliced connection, [4][5][6] sleeve connection, [7][8][9] and socket connection. [10][11][12][13][14][15] The lap-spliced connection as a wet joint has been widely used in practical engineering. Wang et al 4 investigated the seismic performance of the precast piers with pocket connections using noncontact lap-spliced bars, and found that the bar bond length of five times the diameter could well guarantee the anchorage performance.…”
Section: Introductionmentioning
confidence: 99%
“…Accelerated bridge construction, with innovative connection details and construction technologies, has been extensively investigated and put into practical application for years 1–3 . Nowadays, there are three commonly used connection methods of accelerated bridge construction technology, namely, lap‐spliced connection, 4–6 sleeve connection, 7–9 and socket connection 10–15 …”
Section: Introductionmentioning
confidence: 99%