2016
DOI: 10.1016/j.engstruct.2016.06.005
|View full text |Cite
|
Sign up to set email alerts
|

Experimental study on the shear behaviour of precast concrete hollow core slabs with concrete topping

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
40
0
1

Year Published

2017
2017
2024
2024

Publication Types

Select...
8
2

Relationship

0
10

Authors

Journals

citations
Cited by 79 publications
(41 citation statements)
references
References 4 publications
0
40
0
1
Order By: Relevance
“…As the clear space between adjacent girder flanges is short (50,200 and 500mm), the vehicle wheel load would be directly supported by the prestressed concrete girders considering the fact that the vehicular wheel contact area is 460×460mm [105]. The surface of the T-beam would be rough and wet prior to the application of the top slab so as to obtain a better performance [106]. The ultimate goal is to achieve a more economical design approach for slab-on-concrete girder bridges.…”
Section: On-going Researchmentioning
confidence: 99%
“…As the clear space between adjacent girder flanges is short (50,200 and 500mm), the vehicle wheel load would be directly supported by the prestressed concrete girders considering the fact that the vehicular wheel contact area is 460×460mm [105]. The surface of the T-beam would be rough and wet prior to the application of the top slab so as to obtain a better performance [106]. The ultimate goal is to achieve a more economical design approach for slab-on-concrete girder bridges.…”
Section: On-going Researchmentioning
confidence: 99%
“…Structurally, the voided slab system is an effective method for extending the span of a building or structure as it reduces the weight of concrete. Several researchers have maintained that the voided slab system would be advantageous not only in terms of structural and economic aspects but also because of its environmental friendliness [35][36][37]. From the structural design perspective, there are several studies that have examined and confirmed the stability and reliability of the voided slab system.…”
Section: Introductionmentioning
confidence: 99%
“…Cho and Chae [11] recommended the utilisation of recycled material and by-products, such as blast furnace slag and silica fume, as building materials during the construction stage. Likewise, design optimisation, such as replacing the structural systems, is one of the beneficial approaches during the early execution of construction projects [8,[28][29][30][31][32].…”
Section: Introductionmentioning
confidence: 99%