2019
DOI: 10.1007/s10749-019-00984-3
|View full text |Cite
|
Sign up to set email alerts
|

Experimental Substantiation of Leveling the Zagorsk PSP-2 Powerhouse

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…The depth of the compressed base is 40 meters, and the vertical distance between the gaskets, following the available controlled grouting examples, may reach about 1 meter [4][5][6][7]. The analysis of different gasket grouting options showed that the most efficient method is the subsequent grouting into the gasket pillar starting from the bottom one.…”
Section: Resultsmentioning
confidence: 99%
“…The depth of the compressed base is 40 meters, and the vertical distance between the gaskets, following the available controlled grouting examples, may reach about 1 meter [4][5][6][7]. The analysis of different gasket grouting options showed that the most efficient method is the subsequent grouting into the gasket pillar starting from the bottom one.…”
Section: Resultsmentioning
confidence: 99%