Facility Layout Optimization of an Ammonia Plant Based on Risk and Economic Analysis

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
15
0
2

Year Published

2017
2017
2023
2023

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 24 publications
(17 citation statements)
references
References 6 publications
0
15
0
2
Order By: Relevance
“…Plant footprint 8 trains of 5 modules (53 0 Â 8.5 0 ea.) = 18 020 ft 2 140 985 ft 2 [24] Learning rate by numbering-up…”
Section: Full Capacity In 3 Yearsmentioning
confidence: 99%
“…Plant footprint 8 trains of 5 modules (53 0 Â 8.5 0 ea.) = 18 020 ft 2 140 985 ft 2 [24] Learning rate by numbering-up…”
Section: Full Capacity In 3 Yearsmentioning
confidence: 99%
“…Typically, the plant layout analysis is performed at later design stages of process lifecycle (Brunoro Ahumada et al, 2018). There are a number of research works available in the literature to propose the plant layout, for example, cost and safety aspects for plant layout by genetic algorithm (Caputo et al, 2015), mixed integer nonlinear programming (MINLP) (Latifi et al, 2017), mixed integer linear programming (MILP) (Guirardello and Swaney, 2005;Patsiatzis et al, 2004;Rahman et al, 2014) and mixed integer optimization (MIO) (Xu and Papageorgiou, 2009). Although the MILP approach has been recently applied for the layout of storage vessels at the design stage (de Lira-Flores et al, 2018), it is not clearly defined whether the design stage is preliminary, basic or detailed.…”
Section: The Distance Between Process Equipmentmentioning
confidence: 99%
“…At first the critical equipment were selected. These units were chosen based on their operating conditions and reported accident frequencies [24].The units are, namely, the ammonia converter, primary reformer, secondary reformer, urea synthesis reactor and high pressure stripper. The objective is to evaluate whether facilities, such as, control room or operators' shelters are safely sited with respect to these critical units.…”
Section: Case Study: Evaluation Of Facility Siting Of An Existing Ammmentioning