Failure Analysis of PRDS Pipe in a Thermal Power Plant Boiler

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 14 publications
0
2
0
Order By: Relevance
“…This finally leads to huge financial loss, therefore, it is essential to investigate the failure root cause in the fired heater. The root cause of failure has been conducted to prevent the repetitive failure in near future and at the same time, remedial measures are also highlighted to avoid similar failure [2].…”
Section: Fig 1 Fired Heatermentioning
confidence: 99%
“…This finally leads to huge financial loss, therefore, it is essential to investigate the failure root cause in the fired heater. The root cause of failure has been conducted to prevent the repetitive failure in near future and at the same time, remedial measures are also highlighted to avoid similar failure [2].…”
Section: Fig 1 Fired Heatermentioning
confidence: 99%
“…The voltage and current are more prone to perturbations. At the same time, the negative incremental impedance characteristics of the constant-power loads will amplify the system's perturbations, which makes the stability problem of the AC-DC hybrid microgrid system in the islanding mode stability problem of the hybrid AC/DC microgrid system in islanding mode is more prominent [13][14][15].…”
Section: Introductionmentioning