1990
DOI: 10.2172/6973885
|View full text |Cite
|
Sign up to set email alerts
|

Field Lysimeter Test Facility: Second year (FY 1989) test results

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

1
10
0

Year Published

1990
1990
2010
2010

Publication Types

Select...
6
3

Relationship

1
8

Authors

Journals

citations
Cited by 15 publications
(11 citation statements)
references
References 0 publications
1
10
0
Order By: Relevance
“…(Please refer to references12, 14,15,19,31,44,48,49,50,62, and 77 in Section 7.0. Section 8.0 provides referencesto engineereddrawings prepared to support the constructionof the FLTF.)…”
Section: Whc-ep-0673mentioning
confidence: 99%
“…(Please refer to references12, 14,15,19,31,44,48,49,50,62, and 77 in Section 7.0. Section 8.0 provides referencesto engineereddrawings prepared to support the constructionof the FLTF.)…”
Section: Whc-ep-0673mentioning
confidence: 99%
“…The Field Lysimeter Test Facility (FLTF) was originally constructed from November 1986 through June 1987 , Campbell et al 1990) and is located adjacent to the HMS. There are three different lysimeter types at the FLTF: fourteen 3 m deep by 2 m diameter drainage lysimeters; six 3 m deep by 0.3 m diameter small-tube lysimeters; and four 1.5 m by 1.5 m by 1.7 m deep weighing lysimeters.…”
Section: Field Lysimeter Test Facility (Fltf)mentioning
confidence: 99%
“…The impactsof water-relatedtreatmentson measured and modeledwater balance are the main focus of this report Becausethis report has a limitedfocus, a bibliographyis includedto assist readers in locating closelyrelatedliterature(see Section6). Specifically,detailed information about constructionand the first 2 years of operationsat the FLTF are availablein the reports preparedby , Gee et al (1989),and Campbell et al (1990).…”
Section: Location Of the Field Lysimeter Test Facility (Fltf) Adjacenmentioning
confidence: 99%