2010
DOI: 10.2172/977375
|View full text |Cite
|
Sign up to set email alerts
|

Financial analysis of experimental releases conducted at Glen Canyon Dam during water years 1997 through 2005.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2011
2011
2017
2017

Publication Types

Select...
3

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 1 publication
0
2
0
Order By: Relevance
“…Hydropower is generally regarded as an excellent source for providing regulation, load following, and contingency reserves and can also provide voltage control and black-start capabilities. Other studies have shown that under certain operational regimes, GCD is capable of providing ancillary services to the grid (Harpman, 1997, Veselka et al, 2010).…”
Section: Ancillary Servicesmentioning
confidence: 99%
“…Hydropower is generally regarded as an excellent source for providing regulation, load following, and contingency reserves and can also provide voltage control and black-start capabilities. Other studies have shown that under certain operational regimes, GCD is capable of providing ancillary services to the grid (Harpman, 1997, Veselka et al, 2010).…”
Section: Ancillary Servicesmentioning
confidence: 99%
“…At the typical operating point of 0.99 pf, the capacity is slightly less (Seitz 2004). Historically the plant has operated at a 0.99 pf (Veselka 2010b). The powerplant electricity production serves the demands of 5.8 million consumers in 10 western states that are located in the Western Electricity Coordinating Council (WECC) region of the North American Electric Reliability Corporation.…”
Section: Introductionmentioning
confidence: 99%