“…- lated to identification, cause-effect and their analysis (Choudhry et al, 2014;Shen et al, 2017;Xu et al, 2018); -Schedule optimization algorithms and models: A number of CPS optimization algorithms have been studied to solve multiple CPS problems, either single objective or multiple objectives, with single or multiple constraints such as genetic algorithm (Long & Ohsato, 2009;Zou et al, 2016), fuzzy stochastic network (Radziszewska-Zielina et al, 2017), Monte Caro simulation (Indhu & Farhan, 2015), fuzzy mathematical models (Castro-Lacouture et al, 2009), constraint programming, linear programming, and symbiotic organisms search (Cheng et al, 2016); -CPS emerging technologies: CPS emerging technologies have been examined in previous studies such as 4D-BIM (Mirzaei et al, 2018) to detect time-space problems, geographical information system (GIS) (Bansal & Pal, 2009) to identify logical error and missed activities, integration of BIM with primavera (Subramani & Ammai, 2018) to manage risks and BIM schedule (Chen et al, 2011;Ding et al, 2015) to assign crew and other resources; -Resource scheduling: One of the most research areas in CPS is to solve resource constrained scheduling problems (Christodoulou et al, 2012;Giran et al, 2017). It includes but not limited to, resource allocation (Khanzadi et al, 2016), resource levelling (El-Rayes & Jun, 2009), resource utilization (Siu et al, 2016); -Lean project scheduling: The application of lean principle (e.g. Last Planner System (LPS)) has been widely studied to improve performance of project scheduling.…”