Day 2 Tue, November 16, 2021 2021
DOI: 10.2118/207889-ms
|View full text |Cite
|
Sign up to set email alerts
|

First Successful Run of 17.5 Inch Hybrid Bit in ADNOC Onshore to Drill Deviated Section

Abstract: In the onshore drilling operation the main objective is always finding ways to optimize cost and improve the efficiency of drilling operations. Among the various available option, one possibility was to drill 17.5" deviated section in one run through the interbedded formation, which cause high vibrations and risk of twist-off. This section previously was drilled with minimum 2-3 bit runs for a heavy casing design. This would definitely reduce the well duration and cost. The plan involved to drill 17.5" deviate… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 7 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?