2022
DOI: 10.1016/j.ijepes.2022.108225
|View full text |Cite
|
Sign up to set email alerts
|

Flexibility-based generation maintenance scheduling in presence of uncertain wind power plants forecasted by deep learning considering demand response programs portfolio

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
10
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 23 publications
(10 citation statements)
references
References 36 publications
0
10
0
Order By: Relevance
“…Operational efficiency is a key consideration for energy sector entities, including operators of renewable energy facilities. Accurate production estimations enable these organizations to plan operational activities effectively, including scheduled maintenance [19], production optimization, and human resource management [20]. The reduction in electricity costs is a significant benefit stemming from accurate production estimation.…”
Section: State Of the Artmentioning
confidence: 99%
“…Operational efficiency is a key consideration for energy sector entities, including operators of renewable energy facilities. Accurate production estimations enable these organizations to plan operational activities effectively, including scheduled maintenance [19], production optimization, and human resource management [20]. The reduction in electricity costs is a significant benefit stemming from accurate production estimation.…”
Section: State Of the Artmentioning
confidence: 99%
“…By incentivizing consumers to adjust their electricity usage in response to frequency deviations, the demand can be dynamically managed to match the available generation capacity [25]. This active participation of consumers helps to stabilize the PIAT grid frequency [26], [27].…”
Section: Electrical System Operation (Eso)mentioning
confidence: 99%
“…(26). The st of constraints (27) ensures that the scheduled reserve is higher than a specified threshold for all periods.…”
Section: Formulation Of Proposed Ufgms Idrrsmentioning
confidence: 99%
“…3 and the peak load of system is 2850 MW [26]. In this study, the eps and reserve criterion are considered 10 -6 and 20%, respectively [27]. The maintenance scheduling and flexibility evaluation horizons are assumed 52-week and 8736 hours, respectively.…”
Section: Numerical Analysismentioning
confidence: 99%