2021 International Conference on Electrical, Computer and Energy Technologies (ICECET) 2021
DOI: 10.1109/icecet52533.2021.9698658
|View full text |Cite
|
Sign up to set email alerts
|

Flexibility Forecast and Resource Composition Methodology for Virtual Power Plants

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 18 publications
0
2
0
Order By: Relevance
“…Alternatively, the spatio-temporal characteristics of data can be analyzed and extracted [39][40][41]. Iraklis C amplified seasonal data to enhance possible instability of renewable energy production, then predicted the day-ahead flexibility provided by VPP in distributed energy systems [42]. Bandara K used MSTL and a multi-period time series decomposition algorithm to remove the effect of seasonality [43], and proposed a three-layer forecasting framework called LSTM-MSNet.…”
Section: Related Workmentioning
confidence: 99%
“…Alternatively, the spatio-temporal characteristics of data can be analyzed and extracted [39][40][41]. Iraklis C amplified seasonal data to enhance possible instability of renewable energy production, then predicted the day-ahead flexibility provided by VPP in distributed energy systems [42]. Bandara K used MSTL and a multi-period time series decomposition algorithm to remove the effect of seasonality [43], and proposed a three-layer forecasting framework called LSTM-MSNet.…”
Section: Related Workmentioning
confidence: 99%
“…VPPs are receiving increasing attention from academia, industry and the ecological design field, and many researchers are further investigating the concept. At present, the research on VPP mainly includes the integration and optimal dispatching of resources [16][17][18][19][20][21][22][23][24][25], operation management [26][27][28][29][30][31][32] and market transaction and control mechanisms [33][34][35][36][37]. Among them, the selection aggregation and optimal dispatching of VPP resources in the project planning stage have been extensively researched.…”
Section: Introductionmentioning
confidence: 99%