Flexible flow shop scheduling problem to minimize makespan with renewable resources

Abstract: This paper deals with a flexible flow shop (FFS) scheduling problem with unrelated parallel machines and renewable resource shared among the stages. The FFS scheduling problem is one of the most common manufacturing environment in which there is more than a machine in at least one production stage. In such a system, to decrease the processing times, additional renewable resources are assigned to the jobs or machines, and it can lead to decrease the total completion time. For this purpose, a mixed integer linea… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(7 citation statements)
references
References 38 publications
0
7
0
Order By: Relevance
“…Therefore, a Particle Swarm Optimization (PSO) algorithm, as well as a hybrid PSO and SA algorithm named SA-PSO, are developed to solve the model. Through numerical experiments on randomly generated test problems, the authors demonstrate that the hybrid SA-PSO algorithm outperforms the PSO, especially for large-size test problems [19].…”
Section: Literature Surveymentioning
confidence: 99%
“…Therefore, a Particle Swarm Optimization (PSO) algorithm, as well as a hybrid PSO and SA algorithm named SA-PSO, are developed to solve the model. Through numerical experiments on randomly generated test problems, the authors demonstrate that the hybrid SA-PSO algorithm outperforms the PSO, especially for large-size test problems [19].…”
Section: Literature Surveymentioning
confidence: 99%
“…The authors recommended the inclusion of due dates and the consideration of objective functions such as maximum lateness, total tardiness, and the number of tardy jobs in future models. Abbaszadeh et al (2021) tackled the Flexible Flow Shop (FFS) scheduling problem with UPMSPs and a renewable resource shared among the stages. They employed a combination of Simulated Annealing (SA) and PSO algorithms, referred to as SA-PSO, to solve the problem.…”
Section: Hybrid Based Optimization Algorithms For Upmspmentioning
confidence: 99%
“…Other metaheuristic algorithms, such as the Simulated Annealing (SA) algorithm or Particle Swarm Optimization (PSO), may also be used to solve the model. Interested readers are referred to Abbaszadeh et al [40] for more details about these algorithms.…”
Section: Table 2: Description Of Model Parameters and Decision Variablesmentioning
confidence: 99%