Flexible management of repetitive construction processes by an intelligent support system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
13
0
1

Year Published

2014
2014
2021
2021

Publication Types

Select...
5
1
1

Relationship

1
6

Authors

Journals

citations
Cited by 21 publications
(14 citation statements)
references
References 34 publications
0
13
0
1
Order By: Relevance
“…the type of a selected piece of equipment, which is a controllable change) may affect the activity duration and allows resource workflow patterns to be modified. The issue of how resource changes affect production set components and shape the overall production system performance has been discussed by Hajdasz [13].…”
Section: • Changes Influence Identification (Cii)mentioning
confidence: 99%
See 1 more Smart Citation
“…the type of a selected piece of equipment, which is a controllable change) may affect the activity duration and allows resource workflow patterns to be modified. The issue of how resource changes affect production set components and shape the overall production system performance has been discussed by Hajdasz [13].…”
Section: • Changes Influence Identification (Cii)mentioning
confidence: 99%
“…The example presented shows the importance of adhering to technological rules and strict maintenance of work continuity in managing these specific repetitive processes (conducted by slip formwork) and reveals how to selectively operate with the resources available and what is the scope of the maneuver in managing those resources under strict constraints. More detailed explanations of construction work synchronization and process management have been discussed by Hajdasz [13,14].…”
Section: Adaptation Of the Dcpm-tp Model Assumptions Into Mag_811 Simmentioning
confidence: 99%
“…CO2). In 2014 Hajdasz attempted to use the flexibility in the management of cyclical processes on the example of monolithic structure using sliding formwork [28]. As is clear from the literature review a flexible approach is used in the construction management for almost 30 years, but it should be emphasized differences of approach for levels of management and life-cycle phases of a building object.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Contingency theory is the opposite to often encountered practice to striving for universal methods of action applicable in any situation. It should be emphasized contingency evolution from the original concept developed by Lawrence and Lorsch [28] to dynamic contingency assuming proactive approach [30]. From the point of view of the proposed approach contingency has a fundamental importance because of adaptation of the execution options to the specific operating conditions.…”
Section: Theoretical Basis Of Flexible Approachmentioning
confidence: 99%
“…However, for project planning and management, the new project complexities provide various challenges. [1] says that all construction projects can be categorized as complex projects. This is caused by the direct relation between complexity and involving a variety of interrelated parts which should be managed regarding differentiation and interdependency conditions.…”
Section: Introductionmentioning
confidence: 99%