2022
DOI: 10.1155/2022/2134806
|View full text |Cite
|
Sign up to set email alerts
|

Flexible Scheduling Model of Bus Services between Venues of the Beijing Winter Olympic Games

Abstract: Traditional buses travel on fixed routes and areas, which cannot satisfy the flexible demands of athletes in the context of COVID-19 and the closed-loop traffic management policy during the 2022 Beijing Winter Olympic Games (BWOG). This study predicts the travel demands based on the characteristics of athletes’ daily travel demands and then presents a flexible bus service scheduling model for cross-region scheduling among Beijing, Yanqing, and Zhangjiakou to provide high-level service. The flexible bus service… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 28 publications
0
1
0
Order By: Relevance
“…Second, after the data types to be reserved for the CityGML object are confirmed, the IFC object is subjected to traversal judgment with constraint conditions, the redundant information is filtered, and the geometric information and related attribute information required are output. Finally, a multiple LOD model in CityGML format is obtained to truly realize the fusion of BIM + GIS heterogeneous data models [8] Figure 4. BIM + GIS 3D Model Data Fusion Effect…”
Section: Bim+gis 3d Model Data Fusionmentioning
confidence: 99%
“…Second, after the data types to be reserved for the CityGML object are confirmed, the IFC object is subjected to traversal judgment with constraint conditions, the redundant information is filtered, and the geometric information and related attribute information required are output. Finally, a multiple LOD model in CityGML format is obtained to truly realize the fusion of BIM + GIS heterogeneous data models [8] Figure 4. BIM + GIS 3D Model Data Fusion Effect…”
Section: Bim+gis 3d Model Data Fusionmentioning
confidence: 99%