2020
DOI: 10.1016/j.jobe.2020.101393
|View full text |Cite
|
Sign up to set email alerts
|

Flexural behavior of reinforced concrete beams strengthened with near-surface mounted 7075 aluminum alloy bars

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
17
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 32 publications
(17 citation statements)
references
References 35 publications
0
17
0
Order By: Relevance
“…TSEM is one of the sequential excavation method (SEM), based on the bench cut method, and reserving core soil and staggering excavation from the left to right, which is conducive to stability of the tunnel face [45,46]. Longitudinal perspective of TSEM is shown in Figure 7 [47][48][49][50].…”
Section: Construction Sequences Of Tsemmentioning
confidence: 99%
See 1 more Smart Citation
“…TSEM is one of the sequential excavation method (SEM), based on the bench cut method, and reserving core soil and staggering excavation from the left to right, which is conducive to stability of the tunnel face [45,46]. Longitudinal perspective of TSEM is shown in Figure 7 [47][48][49][50].…”
Section: Construction Sequences Of Tsemmentioning
confidence: 99%
“…where E is the elastic modulus of converted shotcrete, E 0 is the elastic modulus of shotcrete, S g is the sectional area of steel arch, E g is the elastic modulus of section steel, and S c is the cross-sectional area of shotcrete. Composite elastic modulus of composite soil above 3 m of the tunnel can be obtained from formulas (1)-(3), the transformation elastic modulus of primary support can be obtained from formula (4), and the rest parameters are based on geological survey reports and some similar studies, as shown in Table 2 [44,46].…”
Section: Conversion Of Elastic Modulus Of Primary Supportmentioning
confidence: 99%
“…When grout is injected into the soil, part of cement particles is blocked by skeleton of soil particles, resulting in stagnation and filtration of these cement particles as well as decrease of grout concentration and blockage of the soil pores. e grouting effect is significantly influenced by limited diffusion channels of the grout [28,[45][46][47]. Advances in Materials Science and Engineering 13…”
Section: Advances In Materials Science and Engineeringmentioning
confidence: 99%
“…If the distance between pile foundation and shield is too close, tunneling may cause uneven settlement, structural deformation, and cracks in buildings [32][33][34][35][36][37]. To ensure the smooth advance of shield and the safety of adjacent pile foundations, it is necessary to take some protective measures [38][39][40][41][42][43][44][45][46][47][48][49][50]. Bilotta and Russo [42] adopted a simple row of piles to prevent buildings from being damaged by tunneling.…”
Section: Introductionmentioning
confidence: 99%