2021
DOI: 10.22441/sinergi.2021.2.001
|View full text |Cite
|
Sign up to set email alerts
|

Flow Shop Scheduling Based on Palmer-Neh, Gupta-Neh and Dannenbring-Neh Algorithms to Minimize the Energy Cost

Abstract: In the manufacturing industry, the most widely used equipment is equipment that uses electricity. Electricity cost is one of the highest operational production costs after labor cost. So, it is very important to save and optimize the use of electrical equipment. One of the manufacturing industries is Taru Martani, Ltd. This research aims to minimize the energy cost by proposing three hybrid algorithms, namely Palmer-NEH, Gupta-NEH, and Dannenbring-NEH methods. Some scheduling evaluation is done using the Effic… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 16 publications
(17 reference statements)
0
0
0
Order By: Relevance