Flowshop scheduling model for bespoke precast concrete production planning

Abstract: Bespoke precast concrete products are particularly designed and custom made for a construction project. The production planning of these products is complicated that considers important concerns, i.e. the reliability of the product delivery programme, the short lead-time competitiveness, and the effective utilization of purpose-built precast moulds. The planning has a high impact on the success of the production. The characteristics of the bespoke precast production are formulated with the flowshop scheduling … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
38
0
2

Year Published

2010
2010
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 55 publications
(40 citation statements)
references
References 24 publications
0
38
0
2
Order By: Relevance
“…The current production plans are based mostly on the rule of thumb, but the outcomes may not certainly reach their goals. Hence, proposing production schedules using systematic methods has become a main research task [4][5][6][7]. …”
Section: Precast Production Practicementioning
confidence: 99%
See 1 more Smart Citation
“…The current production plans are based mostly on the rule of thumb, but the outcomes may not certainly reach their goals. Hence, proposing production schedules using systematic methods has become a main research task [4][5][6][7]. …”
Section: Precast Production Practicementioning
confidence: 99%
“…A genetic algorithm was used in their study to search for better production sequences. In the research conducted by Benjaoran et al [7], the Bespoke Precast Flowshop Scheduling Model (BP-FSSM) was established, in which the features of production methods in prefabrication factories were considered. A MultiObjective Genetic Algorithm was also applied to achieve a solution in their work.…”
Section: Introductionmentioning
confidence: 99%
“…In addition, precast production is a flowshop sequencing problem that can be solved using computational methods. Genetic algorithms have been proven a promising method for arranging precast production schedules (Chan and Hu 2002;Hwang 2001, 2002;Benjaoran et al 2005;Vern, Gunal 1998).…”
Section: Production Schedulingmentioning
confidence: 99%
“…Due to inaccurate planning methods, inefficient resource utilization and overstocking are common sights in the precast industry (Chan and Hu 2002;Dawood 1993;Low and Choong 2001). Researchers have begun using computational techniques to manage scheduling issues (Chan and Hu 2002;Dawood and Neale 1993;Hwang 2001, 2002;Benjaoran et al 2005).…”
Section: Introductionmentioning
confidence: 99%
“…They adopted a genetic algorithm approach and compared the proposed method with some well-established heuristic rules [12]. Benjaoran et al studied the impact of the quantity of molds on shop floor schedules of precast production and proposed a bespoke precast flow shop scheduling model by using a flow shop sequencing model [15]. Ko and Wang applied a multiple-objective genetic algorithm to search for optimum solutions with minimum makespan and tardiness penalties.…”
Section: Introductionmentioning
confidence: 99%