2009
DOI: 10.1109/tpwrs.2009.2030295
|View full text |Cite
|
Sign up to set email alerts
|

Forecasting-Aided State Estimation—Part I: Panorama

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
110
0
6

Year Published

2011
2011
2021
2021

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 199 publications
(116 citation statements)
references
References 55 publications
0
110
0
6
Order By: Relevance
“…Other formulations of DSE can be found in [25], and more detailed survey on DSE techniques can be found in [77].…”
Section: State Filteringmentioning
confidence: 99%
“…Other formulations of DSE can be found in [25], and more detailed survey on DSE techniques can be found in [77].…”
Section: State Filteringmentioning
confidence: 99%
“…Let us consider the following model that represents the slow system dynamics of N buses ( [4]- [6], [19], [20]:…”
Section: A System Model With Missing Rtu Measurementsmentioning
confidence: 99%
“…The initial value of state x(0) is a white Gaussian noise with mean valuex(0) and covariance matrix Σ(0|0). For computational convenience, the state transition matrix A has been traditionally assumed to be diagonal in the dynamic state estimation algorithms of power systems [6].…”
Section: A System Model With Missing Rtu Measurementsmentioning
confidence: 99%
See 1 more Smart Citation
“…[12]. 3 Evaluative research of system development, just like any system operation evaluation, understood as use or renewal of the system, or the evaluation of the electrical power system work are natural consequence of identification research, and, following the verification of development model, evaluation of research results, obtained using the development model, is conducted. However, for the development-related problems, understood as structural and parametric changes of the SEE, and not as planning, forecasting, or programming the development, conducting appropriate evaluation experiments is connected with the need to generate many models of the SEE system development for specific periods of long time ǻș, e.g.…”
Section: Evaluation Of the See System Developmentmentioning
confidence: 99%