2020
DOI: 10.22630/pniks.2020.29.2.20
|View full text |Cite
|
Sign up to set email alerts
|

Forecasting techniques in construction industry: earned value indicators and performance models

Abstract: Machine Learning Regression Techniques (MLRT) as a shrewd method can be utilized in this study being exceptionally fruitful in demonstrating non-linear and the interrelationships among them in problems of construction projects such as the earned value indexes for tall buildings projects in Republic of Iraq. Three forecasting models were developed to foresee Schedule Performance Index (SPI) as first model, Cost Performance Index (CPI) as a second model, and the third model is To Complete Cost Performanc… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0
1

Year Published

2020
2020
2025
2025

Publication Types

Select...
5
2

Relationship

1
6

Authors

Journals

citations
Cited by 16 publications
(3 citation statements)
references
References 4 publications
0
2
0
1
Order By: Relevance
“…The ACWP is defined as the real cost of performed activity during a given time. This cost is the actual cost spent by the contractor and is sometimes confidential [18].…”
Section: Earned Value Methods (Evm)mentioning
confidence: 99%
See 1 more Smart Citation
“…The ACWP is defined as the real cost of performed activity during a given time. This cost is the actual cost spent by the contractor and is sometimes confidential [18].…”
Section: Earned Value Methods (Evm)mentioning
confidence: 99%
“…π‘π‘Ÿπ‘Žπ‘ β„Ž π‘π‘œπ‘ π‘‘ π‘œπ‘“ π‘šπ‘Žπ‘›π‘π‘œπ‘€π‘’π‘Ÿ π‘π‘’π‘Ÿ π‘‘π‘Žπ‘¦ = (π‘›π‘’π‘šπ‘π‘’π‘Ÿ π‘œπ‘“ π‘€π‘œπ‘Ÿπ‘˜β„Žπ‘œπ‘’π‘Ÿ π‘π‘’π‘Ÿ π‘‘π‘Žπ‘¦ Γ— π‘›π‘œπ‘Ÿπ‘šπ‘Žπ‘™ π‘π‘œπ‘ π‘‘ π‘œπ‘“ π‘šπ‘Žπ‘›π‘π‘œπ‘€π‘’π‘Ÿ) + ( 𝑛 Γ— π‘œπ‘£π‘’π‘Ÿπ‘‘π‘–π‘šπ‘’ π‘π‘œπ‘ π‘‘ π‘π‘’π‘Ÿ β„Žπ‘œπ‘’π‘Ÿ) (17) π‘π‘œπ‘ π‘‘ π‘ π‘™π‘œπ‘π‘’ = π‘π‘Ÿπ‘Žπ‘ β„Ž π‘π‘œπ‘ π‘‘ Γ— π‘›π‘œπ‘Ÿπ‘šπ‘Žπ‘™ π‘π‘œπ‘ π‘‘ π‘›π‘œπ‘Ÿπ‘šπ‘Žπ‘™ π‘‘π‘’π‘Ÿπ‘Žπ‘‘π‘–π‘œπ‘› (𝑖𝑛 π‘‘π‘Žπ‘¦π‘ )βˆ’π‘π‘Ÿπ‘Žπ‘ β„Ž π‘‘π‘’π‘Ÿπ‘Žπ‘‘π‘–π‘œπ‘›(18) …”
unclassified
“…Firas et al in 2020 used forecasting techniques such as ANN to calculate the earned value indicators and performance of tall building. [16] The main objective of this study is to develop a mathematical model for artificial neural networks in order to predict the most important indicator of the earned value indexes in highway project, which is the To Complete Schedule Performance Indicator (TCSPI), while identifying the factors affecting it, as well as finding a mathematical equation to calculate the time index easily and simply.…”
Section: Introductionmentioning
confidence: 99%