2009 International Conference on Energy and Environment Technology 2009
DOI: 10.1109/iceet.2009.378
|View full text |Cite
|
Sign up to set email alerts
|

Form and Applicability of a New Urban Sewage Source Heat Pump System with Freezing Latent Heat Collection

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
6
0

Year Published

2011
2011
2014
2014

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(6 citation statements)
references
References 3 publications
0
6
0
Order By: Relevance
“…Qian et al [22] reported that the temperature of urban WW was suitable while its mass flow rate was insufficient as a cooling/heating source. Because the building heat peak load could not be met by a conventional WWSHP, they proposed a special freezing latent heat exchanger and a HP system configuration.…”
Section: Wastewater Heat Pumpsmentioning
confidence: 99%
See 3 more Smart Citations
“…Qian et al [22] reported that the temperature of urban WW was suitable while its mass flow rate was insufficient as a cooling/heating source. Because the building heat peak load could not be met by a conventional WWSHP, they proposed a special freezing latent heat exchanger and a HP system configuration.…”
Section: Wastewater Heat Pumpsmentioning
confidence: 99%
“…Fig. 10 illustrates a schematic of the novel HP system discussed in [22]. The WWHE and the freezing latent heat exchanger operate in series while at the peak heat load two sets of HP units (the firstand second-stage HP units) with the different evaporation temperature are utilized.…”
Section: Wastewater Heat Pumpsmentioning
confidence: 99%
See 2 more Smart Citations
“…It is a promising and renewable when using urban sewage as the cooling and heating resource in the heat pump system in the fields of heating and air conditioning engineering [1~2]. But for different heat load in different areas and sewage discharge coefficient, the ration between general drainage construction area and heat supply area is 7~10:1 [3]. Many occasions, the load demand of users heat supply working condition is not often satisfied.…”
Section: Introductionmentioning
confidence: 99%