Search citation statements
Paper Sections
Citation Types
Year Published
Publication Types
Relationship
Authors
Journals
This paper focuses on the first global installation of a water injector well with a lower completion system that incorporates both premium sand control screens and water injection profile equalization. The equalization of the water injection profile of horizontal wells has been a key issue in many development projects worldwide and has the potential to increase the reservoirs ultimate recovery by increasing the water sweep efficiency. Inflow Control Devices integrated with premium sand control screens have a long history of application in production wells. In these cases the main objective is to create a uniform inflow profile along the horizontal section, delaying unwanted water and gas production and increasing oil recovery. The method through which Inflow Control Devices equalize the inflow of oil can also be used to equalize the outflow of water. Historically, sand control completions for water injection wells include stand-alone conventional screens and open-hole gravel packs. Stand-alone conventional screen completions do not provide equalization of the water injection profile. Open-hole gravel packs provide for an effective acid treatment of the water injector well but present operational risks, high costs, as well as expensive rig time. The installation was carried out in a subsea horizontal sea water injector well in the Campos Basin, offshore Brazil. The paper presents the overall completion plan, the lower completion installation, the acid treatment through the Inflow Control Devices, and the initial water injection results based on production logs and water injectivity tests. The main concerns during the planning phase are discussed, highlighting the procedures adopted to overcome them. The good initial results have created the expectation of many applications of this system in Campos Basin. It is believed that sharing this information will benefit many operators with horizontal water injectors in their field development plans. Marlim The Marlim field, located in the northeastern part of Campos Basin, about 110 km offshore in the state of Rio de Janeiro, was discovered in January 1985. The field covers an area of about 145 km2, in water depths ranging from 600 m (1968 ft) to 1,100 m (3609 ft). The Oligocene sandstone reservoir quality is good. Core analyses of several wells indicate mean permeability of 2,000 md, mean porosity of 30%, and highly friable sandstone. Marlim's reservoir development strategy relies heavily on water injection as a source of reservoir energy maintenance. Currently 9 Floating Production Systems (FPS) are on stream with 129 subsea wells on operation (83 producers and 46 water injectors), including 36 horizontal wells. The total production reached its peak of 650,000 bbl/d in 2002, overcoming all former production forecasts. Currently Marlim field oil production, around 450,000 bbl/d, is supported by injecting 760,000 bbl/d of sea water. The recovery factor to date is 22.9 %. The water production is 217,150 bbl/d (water cut of 33 %) and GOR is equal to the initial solubility ratio, 83 STD m3/STD m3. Water injection is into the oil leg, concentrated in the lower portions of the reservoir and production is concentrated in the upper parts, to delay water breakthrough. A thorough history of the Marlim field can found in references 1 through 6. Injection Well Strategy The water injector well under consideration for this project was to be located in the south area of the Marlim field. This injector well was planned for pressure maintenance and for sweep efficiency in the thin reservoir border of the field. The injector well, IN, and its neighboring producer wells, A, B, C, and D are shown in Figure 1.
This paper focuses on the first global installation of a water injector well with a lower completion system that incorporates both premium sand control screens and water injection profile equalization. The equalization of the water injection profile of horizontal wells has been a key issue in many development projects worldwide and has the potential to increase the reservoirs ultimate recovery by increasing the water sweep efficiency. Inflow Control Devices integrated with premium sand control screens have a long history of application in production wells. In these cases the main objective is to create a uniform inflow profile along the horizontal section, delaying unwanted water and gas production and increasing oil recovery. The method through which Inflow Control Devices equalize the inflow of oil can also be used to equalize the outflow of water. Historically, sand control completions for water injection wells include stand-alone conventional screens and open-hole gravel packs. Stand-alone conventional screen completions do not provide equalization of the water injection profile. Open-hole gravel packs provide for an effective acid treatment of the water injector well but present operational risks, high costs, as well as expensive rig time. The installation was carried out in a subsea horizontal sea water injector well in the Campos Basin, offshore Brazil. The paper presents the overall completion plan, the lower completion installation, the acid treatment through the Inflow Control Devices, and the initial water injection results based on production logs and water injectivity tests. The main concerns during the planning phase are discussed, highlighting the procedures adopted to overcome them. The good initial results have created the expectation of many applications of this system in Campos Basin. It is believed that sharing this information will benefit many operators with horizontal water injectors in their field development plans. Marlim The Marlim field, located in the northeastern part of Campos Basin, about 110 km offshore in the state of Rio de Janeiro, was discovered in January 1985. The field covers an area of about 145 km2, in water depths ranging from 600 m (1968 ft) to 1,100 m (3609 ft). The Oligocene sandstone reservoir quality is good. Core analyses of several wells indicate mean permeability of 2,000 md, mean porosity of 30%, and highly friable sandstone. Marlim's reservoir development strategy relies heavily on water injection as a source of reservoir energy maintenance. Currently 9 Floating Production Systems (FPS) are on stream with 129 subsea wells on operation (83 producers and 46 water injectors), including 36 horizontal wells. The total production reached its peak of 650,000 bbl/d in 2002, overcoming all former production forecasts. Currently Marlim field oil production, around 450,000 bbl/d, is supported by injecting 760,000 bbl/d of sea water. The recovery factor to date is 22.9 %. The water production is 217,150 bbl/d (water cut of 33 %) and GOR is equal to the initial solubility ratio, 83 STD m3/STD m3. Water injection is into the oil leg, concentrated in the lower portions of the reservoir and production is concentrated in the upper parts, to delay water breakthrough. A thorough history of the Marlim field can found in references 1 through 6. Injection Well Strategy The water injector well under consideration for this project was to be located in the south area of the Marlim field. This injector well was planned for pressure maintenance and for sweep efficiency in the thin reservoir border of the field. The injector well, IN, and its neighboring producer wells, A, B, C, and D are shown in Figure 1.
Offshore wells, especially deepwater completions, are usually completed with semisubmersible rigs. These use subsea trees, and workovers require moving a costly rig to the location. Solving problems remotely—with an interventionless method—provides huge savings and fewer risks. This paper focuses on the first global installation of a gravel pack system that allowed continuous pay zone chemical treatment pumping without interrupting production. For wells with issues such as barium and calcium sulfates causing obstruction at the sand control screen base pipe holes, this system allowed pumping of scale inhibitors (or any other chemical treatment) to the end of the horizontal well (toe) or to other parts of open- or cased-hole sections without needing to stop production. For this first installation, the system incorporated zonal isolation with feedthrough capabilities using reactive element packer and multiple injection nipples technology, taking advantage of a long shale segment to divide the well in two parts. In general, the number of injection nodes with the same pumping line could vary from well to well. However, at this deepwater installation offshore Brazil, the system was designed to allow continuous pumping of chemicals through only one small-diameter down into a horizontal open hole, to inside the sand control screens at two separate sections of the well, one at the toe and another above the reactive element packer. The system allowed for screen assembly installation and gravel pack pumping in one trip. A reconnect anchor seal assembly was designed and used to deliver a continuality of the flowline conduit from the gravel pack assembly to the upper string assembly. It also incorporated a cost-effective, high-flow liner system for the conduit/injection mandrel protection and a special feedthrough quick connector to simplify certain steps in the assembly. This allowed for torque and traction transmission in open-hole deployment. This paper will describe the implementation and installation of this new system.
Offshore deepwater fields usually require a semisubmersible rig to drill and complete their wells. Additionally, if any intervention is required in the well, a costly workover rig will need to be moved to the site. Hence, solving problems remotely using a method requiring less intervention can provide substantial savings in the overall cost of the well. Such an opportunity emerged when working on a project in the offshore oilfields of Brazil, where use of water injection as a reservoir energy maintenance method is common. However, the mixture of water injection wells and oil producing wells can lead to the formation of barium sulfate on downhole equipment, which can precipitate under pressure change during production. Barium sulfate's insolubility makes its removal difficult; usually requiring the use of special tools for mechanically cleaning the gravel pack screens’ interior. This type of intervention method requires an offshore rig. It demands a considerable amount of time and resources to complete the cleanup procedure, especially in the case of long openhole horizontal gravel packs. However, by pumping inhibitors directly to the gravel pack screens’ interior, production suspension is avoided, along with any intervention-related time and cost. This paper will describe the world's first installation of a horizontal openhole gravel pack system specifically designed to allow continuous pumping of scale inhibitors. The chemicals were injected through a single flowline down to the interior of the sand-control screens at two distinct parts of the well pay zone, without interrupting oil production in offshore Brazil. This pay zone management system incorporates a hydraulic wet connector, an openhole zonal isolation packer, and two chemical injection mandrels with flow regulator valves. The mandrel valves evenly distribute the barium sulfate inhibitor, preventing its deposit inside the screen. Potential applications of this system in offshore Brazil are being considered on the basis of this successful first installation. Results of this project, as well as other compelling data, suggest that operators may benefit from its incorporation in their field development plan, maximizing their return on investment.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.