2017
DOI: 10.1051/matecconf/201710608091
|View full text |Cite
|
Sign up to set email alerts
|

Formation of tools of resource providing management at the enterprise of the industry of construction materials in modern conditions

Abstract: Abstract. The retrospective analysis of the results of activities at the level of industrial sector of the Russian economy in general and at the level of certain subjects of economy -the enterprise of construction materials and products is completed in the article. According to the analysis results the insufficient efficiency of the use of cumulative resource capacity of the enterprises is proved and the need of the development of complex tools of resource providing management, to which the priority attention … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 13 publications
(5 citation statements)
references
References 11 publications
0
5
0
Order By: Relevance
“…The need for the development of integrated resource management tools is ide ified. The ed a age e a e ba ed he a ache f b i di g management, which are aimed at the maximum concentration of enterprise resources [16].…”
Section: Resultsmentioning
confidence: 99%
“…The need for the development of integrated resource management tools is ide ified. The ed a age e a e ba ed he a ache f b i di g management, which are aimed at the maximum concentration of enterprise resources [16].…”
Section: Resultsmentioning
confidence: 99%
“…The need to ensure the ongoing development of interregional networks of the carriers is also associated with difficulties exercising control over the vehicles and accept the goods in transit [7,8].…”
Section: Resultsmentioning
confidence: 99%
“…The external and internal environment of companies is constantly changing. therefore, the developed model of the motivation system for the development project team should change and adapt to changes [17]. New principles of the motivation system, performance indicators of the project team members may be added, changes in the list of motivation tools or in the methods of calculating the amount of remuneration will be required.…”
Section: Discussionmentioning
confidence: 99%