Formulation and Methods for a Class of Two-stage Flow-shop Scheduling Problem with the Batch Processor

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 15 publications
0
2
0
Order By: Relevance
“…Under this optimization objective, the average time saving is 10.35%, and the average energy saving is 10.63%. The fitness calculation method is changed to: 𝑓𝑖𝑑𝑛𝑒𝑠𝑠 = 𝑒 π‘‡π‘–π‘šπ‘’ 𝑒π‘₯𝑝 βˆ’π‘‡π‘–π‘šπ‘’ π‘π‘œπ‘’π‘›π‘‘ + π‘Š 𝑒π‘₯𝑝 π‘Š π‘π‘œπ‘’π‘›π‘‘ (22) This fitness calculation method amplifies the influence of power consumption parameters on fitness and reduces the influence of time. Using this method to optimize the scheduling of batch 4 workpieces, the final consumption time is 7063.54 min, and the energy consumption is 42.12 GJ.…”
Section: Change Optimization Goalsmentioning
confidence: 99%
See 1 more Smart Citation
“…Under this optimization objective, the average time saving is 10.35%, and the average energy saving is 10.63%. The fitness calculation method is changed to: 𝑓𝑖𝑑𝑛𝑒𝑠𝑠 = 𝑒 π‘‡π‘–π‘šπ‘’ 𝑒π‘₯𝑝 βˆ’π‘‡π‘–π‘šπ‘’ π‘π‘œπ‘’π‘›π‘‘ + π‘Š 𝑒π‘₯𝑝 π‘Š π‘π‘œπ‘’π‘›π‘‘ (22) This fitness calculation method amplifies the influence of power consumption parameters on fitness and reduces the influence of time. Using this method to optimize the scheduling of batch 4 workpieces, the final consumption time is 7063.54 min, and the energy consumption is 42.12 GJ.…”
Section: Change Optimization Goalsmentioning
confidence: 99%
“…Two scientific articles [19,20] used an exact algorithm to solve the scheduling optimization problem, but the total time required for optimization was longer when the number of orders was large. In other scientific articles [21][22][23], researchers used a heuristic algorithm to optimize the workshop scheduling problem. Still, the heuristic algorithm is a suggested optimization method; its final solution is only a better solution, and the overall optimization effect is poor.…”
Section: Introductionmentioning
confidence: 99%