In the aerospace industry, many important components are made of ring forgings with characteristics of multi-variety and multi-batch. Such components have many steps and complex parameters in the thermoforming process. The process orders are dynamic and time-varying, and, thus, optimizing the total production time and energy consumption is difficult. To solve the mentioned troublesome and time-consuming problem, this work transformed the workpieceβs required heating temperature and time index into the furnace temperature change and holding time index. Based on a genetic algorithm, an integrated production scheduling optimization of ring forging heating and model forming was established. The genetic algorithm for model improvement was optimized. The optimization objective was changed by using different fitness calculation methods. A multi-time simulation algorithm was designed to calculate each heating furnaceβs time and furnace temperature. The proposed optimization method was used for a thermoforming process of ring forgings. When the optimization objective was designed to consider energy consumption and time consumption comprehensively, the average time saving was 6.93%, and the average energy saving was 12.99%. When the optimization objective was designed to prioritize energy consumption, the average time saving was 3.89%, and the average energy saving was 16.53%. When the optimization objective was designed to prioritize time consumption, the average time saving was 10.35%, and the average energy saving was 10.63%. Using the scheduling results for production, compared with the practical factory data, the errors in the simulation time and energy consumption were 2.4% and 1.6%. The results show that the scheduling efficiency of integrated thermoforming production is significantly improved by using this optimization model, and the simulation results have high reliability. The energy consumption of orders is greatly reduced, and the total production time is greatly shortened.