“…The developed SCENRED program in GAMS [44], was applied to the modified 48-bus DSN line damages scenarios predicted from combined statistical DSN's line FC-MCS model, to reduce its predicted 1000-line fault scenarios to 10 with their corresponding optimum probabilities of system line fault for each reduced system line fault scenario generated. See (31)(32), (32)(33), , (34)(35), (35)(36), (35)(36)(37), (37)(38), (39)(40), (40)(41), (41)(42), (42)(43), (44)(45), (44)(45)(46), (46)(47)(48), (47)(48) 0.0570 Sc9 (23)(24), (27)(28), (28)(29), (31)(32), (32)(33), , (34)(35), (35)(36), (35)(36)…”