“…One frequently used method involves the freezing of the MPS. Several studies have proposed alternative ways of freezing the MPS (Sridharan et al, 1987(Sridharan et al, , 1988 and have compared the effectiveness of freezing the MPS against other methods (Sridharan and LaForge, 1990;Kadipasaoglu and Sridharan, 1995). Lee (1993, 1996) examined the impact of different parameters for freezing the MPS upon total cost, schedule instability and service level in multi-stage systems.…”