Volume 1: Offshore Technology; Special Symposium on Ocean Measurements and Their Influence on Design 2007
DOI: 10.1115/omae2007-29635
|View full text |Cite
|
Sign up to set email alerts
|

Full Scale Monitoring Marco Polo Tension Leg Platform

Abstract: Installed 160 miles South of New Orleans in 1300 m of water, the Marco Polo Tension Leg Platform is subjected to an extensive monitoring campaign to benchmark design data and methods. The purpose of the full scale monitoring campaign is to evaluate the design in operation exposed to hurricane and loop-current conditions. Interests comprise the high and low frequency modes of motion, the fatigue loading of the platform and the dynamic behavior of the tendons and risers with focus on vortex induced vibrations. T… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
8
0

Year Published

2007
2007
2015
2015

Publication Types

Select...
4
1
1

Relationship

1
5

Authors

Journals

citations
Cited by 9 publications
(8 citation statements)
references
References 9 publications
0
8
0
Order By: Relevance
“…It should be noted that the present distributions are based on long-crested waves in a model basin and that the situation in a short-crested seastate can be different [2]. However, also in the full scale measurements at the Marco Polo TLP similar trends and crest heights were observed [8]. Figure 15 gives an example of the present wave compared to a wave measured during Hurricane Rita.…”
Section: Distributions Of the Extremesmentioning
confidence: 61%
See 3 more Smart Citations
“…It should be noted that the present distributions are based on long-crested waves in a model basin and that the situation in a short-crested seastate can be different [2]. However, also in the full scale measurements at the Marco Polo TLP similar trends and crest heights were observed [8]. Figure 15 gives an example of the present wave compared to a wave measured during Hurricane Rita.…”
Section: Distributions Of the Extremesmentioning
confidence: 61%
“…Hurricanes Ivan, Katrina and Rita in the Gulf of Mexico confirmed the importance of these extreme waves for all types of offshore structures [4][5][6][7][8]. At the 'Marco Polo' TLP [8] a maximum wave height of more than 28 m was recorded during hurricane Rita. To assure the integrity and safety of a platform, extreme waves should be taken into account in the design.…”
Section: Introductionmentioning
confidence: 92%
See 2 more Smart Citations
“…Floating structures of deep-water platforms, such as tension leg platform (TLPs), 9 SPARs, [10][11][12] semi-submersible platform (SEMIs), 13 and FPSOs, [14][15][16][17][18] have been successfully and widely applied, whereas the monitoring of SYMs in shallow water has seldom been reported. In this study, the method of monitoring SYM in Bohai Bay was carried out.…”
Section: Introductionmentioning
confidence: 99%