2014
DOI: 10.4028/www.scientific.net/amr.1044-1045.1753
|View full text |Cite
|
Sign up to set email alerts
|

Function Effects Post-Evaluation for Substation Construction Project Based on Multi-Level Extension Assessment Method

Abstract: This paper established a multi-level extension model for function effects post-evaluation of substation construction project, the model not only reduces the influence of subjective factors on the evaluation results, but also can determines the key factors which affect the quality of the evaluation results and overall developing trend of the project and provides some suggestions for the project late operation. Taking into account the fact that the element of the judgment matrix formed by traditional AHP is a ce… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 9 publications
0
1
0
Order By: Relevance
“…Thus, both the characteristics of the current point and the evaluation of future development need to be considered in the sustainability postevaluation indicator system to ensure continuous evaluation [11], [18], [27]. The internal conditions reflect the financial operational level, the advanced nature of technique level, the level of management system, enterprise competitiveness, primary energy ratio (PER), relative energy saving rate (RESR) and security [11], [34], [56], [61]. The external conditions, considering the impact of economic development social environment and other external factors, are to enhance the ability of a project to maintain a high service level and operating ability, and improve the comprehensiveness and accuracy of the evaluation results [24], [29], [32].…”
Section: Post-evaluation Indicators On Sustainabil-itymentioning
confidence: 99%
“…Thus, both the characteristics of the current point and the evaluation of future development need to be considered in the sustainability postevaluation indicator system to ensure continuous evaluation [11], [18], [27]. The internal conditions reflect the financial operational level, the advanced nature of technique level, the level of management system, enterprise competitiveness, primary energy ratio (PER), relative energy saving rate (RESR) and security [11], [34], [56], [61]. The external conditions, considering the impact of economic development social environment and other external factors, are to enhance the ability of a project to maintain a high service level and operating ability, and improve the comprehensiveness and accuracy of the evaluation results [24], [29], [32].…”
Section: Post-evaluation Indicators On Sustainabil-itymentioning
confidence: 99%