Gas-Neutralizing and Dust-Suppressing Stemming of Borehole Charges for Increasing the Environmental Safety of Explosion

Abstract: The problem of environmental pollution during the explosive destruction of rocks in order to extract minerals is solved in the article. Two types of borehole charge stemming design have been developed, which, in addition to the function of locking the products of the explosion, allow completely neutralizing harmful gases. The first type is the stemming design, which includes the two-stage purification of harmful gases, formed during the explosive destruction of rocks, and is based on chemisorption of gases by … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…[13] Formation of air or water gaps between the charge and the wall of the borehole [14], [15] Сhanging of technological parameters, in particular the site width, the bench height and length of the excavating unit which might provide the necessary intensity of mining operations in the deep levels in an open-cast mine [16] Engineering and technical measures Use of more environmentally friendly explosives or change their recipe [17], [18] Application of hydro stemming or stemming containing surfactants or stemming containing substances that can neutralize harmful gases [6], [19]- [21] Spraying of blocks before a blast [6] Irrigation of the blown up block [6] Constructing the hydro curtains [6] Using special decks in boreholes to enhance the quality of fractional composition of rock mass and to reduce the level of vibration [22] Research of physical and mechanical properties of rocks and the use of the obtained data in the process of designing the blasting parameters and charge formation [23] Organizational measures…”
Section: Technological Measuresmentioning
confidence: 99%
“…[13] Formation of air or water gaps between the charge and the wall of the borehole [14], [15] Сhanging of technological parameters, in particular the site width, the bench height and length of the excavating unit which might provide the necessary intensity of mining operations in the deep levels in an open-cast mine [16] Engineering and technical measures Use of more environmentally friendly explosives or change their recipe [17], [18] Application of hydro stemming or stemming containing surfactants or stemming containing substances that can neutralize harmful gases [6], [19]- [21] Spraying of blocks before a blast [6] Irrigation of the blown up block [6] Constructing the hydro curtains [6] Using special decks in boreholes to enhance the quality of fractional composition of rock mass and to reduce the level of vibration [22] Research of physical and mechanical properties of rocks and the use of the obtained data in the process of designing the blasting parameters and charge formation [23] Organizational measures…”
Section: Technological Measuresmentioning
confidence: 99%