2015
DOI: 10.1016/j.egypro.2015.11.295
|View full text |Cite
|
Sign up to set email alerts
|

Gaussian Process Model for Control of an Existing Building

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2017
2017
2020
2020

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 13 publications
0
1
0
Order By: Relevance
“…In Su et al (2017), GP model has been coupled with Monte Carlo simulations to perform a reliability analysis of complex engineering structures. An application of GP to control an existing building can be found in Ahn et al (2015). In Wan et al (2014), a surrogate model based on GP has been established to deal with uncertainty quantification for modal frequencies.…”
Section: Introductionmentioning
confidence: 99%
“…In Su et al (2017), GP model has been coupled with Monte Carlo simulations to perform a reliability analysis of complex engineering structures. An application of GP to control an existing building can be found in Ahn et al (2015). In Wan et al (2014), a surrogate model based on GP has been established to deal with uncertainty quantification for modal frequencies.…”
Section: Introductionmentioning
confidence: 99%