Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
88
0
8

Year Published

2014
2014
2024
2024

Publication Types

Select...
5
3
2

Relationship

0
10

Authors

Journals

citations
Cited by 163 publications
(96 citation statements)
references
References 7 publications
0
88
0
8
Order By: Relevance
“…BIM has successfully been integrated and used by other analytical tools-for instance BIM-assisted material quantification and cost estimates-that have achieved better performance over traditional methods [35]. An extension of BIM has been to enable the generation of construction tasks and activity duration by connecting BIM to a database containing productivity rates [36]. BIM has also been used for thermal simulation and analysis, which has allowed for exploration of the thermal performance in different phases of the life cycle of the building [37].…”
Section: Discrete Event Simulation and Building Information Modelingmentioning
confidence: 99%
“…BIM has successfully been integrated and used by other analytical tools-for instance BIM-assisted material quantification and cost estimates-that have achieved better performance over traditional methods [35]. An extension of BIM has been to enable the generation of construction tasks and activity duration by connecting BIM to a database containing productivity rates [36]. BIM has also been used for thermal simulation and analysis, which has allowed for exploration of the thermal performance in different phases of the life cycle of the building [37].…”
Section: Discrete Event Simulation and Building Information Modelingmentioning
confidence: 99%
“…Also, the research works addressed the issues relevant to temporary construction and importance of its planning (Chi, Hampson and Biggs, 2012;Mansuri et al, 2017). Furthermore, information for quantity estimates can be prepared by extracting detailed quantity information from the exact 3D model with consistency (Kim et al, 2013), also easing the process of resolving conflicts and site logistics using 4D simulation (Hartmann, Gao and Fischer, 2008; American Institute of Architects, 2009).…”
Section: Use Of Bim In Construction Phase Of Projectsmentioning
confidence: 99%
“…Shan et al [10] used the Visual Basic for Application (VBA) of MS Excel and BIM to develop a project scheduling system that considered the temperature and humidity factors; Moon et al [11] developed a systematic schedule simulation system to minimize overlapping activities for the enhancement of a project's operational performance by integrating fuzzy set, GA, risk factors, and BIM; Hijazi et al [12] proposed a BIM-based 4D simulation method to assess the constructability of a building construction project so that the construction schedule can be improved. Other BIM-based scheduling systems including Chen et al [13], Kim et al [14], and Zhou et al [15]; all of these BIM-based systems utilize the 3D visualization functions to facilitate the construction schedulers in developing a more accurate project schedule.…”
Section: Integration Of 3d Modeling Techniques and Schedulingmentioning
confidence: 99%