1993
DOI: 10.2118/22983-pa
|View full text |Cite
|
Sign up to set email alerts
|

Genesis of a Three-Phase Subsea Metering System

Abstract: Summary. This paper describes the development of a three-phase metering system for installation on seabed templates at or near subsea wellheads. It tracks the development of the system from its conception through continuing tests on a production platform in the North Sea. The paper also reviews modification of the original design as a result of 1989 offshore tests. Introduction Current challenges facing offshore operations in… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

1998
1998
1998
1998

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 3 publications
0
1
0
Order By: Relevance
“…The system's operating conditions and flow measurement range were based on the design requirements of the Highlander template and on a reasonably broad range of oil, gas and water production rates for a single well. The specific criteria are ( 1) Deployment subsea to depths of 1000 ft. (300 meters).…”
Section: System Design Considerationsmentioning
confidence: 99%
“…The system's operating conditions and flow measurement range were based on the design requirements of the Highlander template and on a reasonably broad range of oil, gas and water production rates for a single well. The specific criteria are ( 1) Deployment subsea to depths of 1000 ft. (300 meters).…”
Section: System Design Considerationsmentioning
confidence: 99%