“…In total, approximately 11.4 Mt of mining waste material is stored at the Plombières mining site (Helser & Cappuyns, 2021). The Plombières tailing material was sampled on-site through a hand excavated pit-hole and about 25 kg of material was taken from a yellow clayish layer (classified as yellow tailings) at 1.10 m depth (SUL_PL_62_I -Figure 2), being the most prominent layer in this tailing dam, with a thickness of ± 5 meters (Bevandid et al, 2021). Before sampling, the first meter of heterogeneous material (from appearance: soil, slag, black sand material, ceramic pipes, ceramic bricks, brown silt material and other remaining material) was removed.…”