Geological hazards of SW Natib Volcano, site of the Bataan Nuclear Power Plant, the Philippines

Abstract: The SW sector of Mount Natib, a potentially active volcano in the Bataan volcanic arc in western Luzon, is the site of a mothballed nuclear power plant that members of the national legislature have proposed to activate. Detailed geological fieldwork was conducted to assess the capability of the volcano and to identify any volcanic hazards it might pose to the nuclear plant. The nearest eruptive centre is 5.5 km away from the plant. SW Natib Volcano is underlain by lava flows, lahar deposits and at least six py… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2013
2013
2022
2022

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 7 publications
(5 citation statements)
references
References 27 publications
0
5
0
Order By: Relevance
“…This is despite the fact that DEMs such as those from SRTM and ASTER are being used as major sources of topographic information for many applications including hydrological analysis and simulations (e.g., Jaranilla-Sanchez et al, 2011;Santillan et al, 2011;Sarmiento et al, 2012;Clutario and David, 2014;Chen and Senarath, 2014), flood modelling and hazard mapping (e.g., Abon et al, 2011;Ignacio and Henry, 2013), geological hazard analysis (e.g., Lagmay et al, 2012), and landslide mapping characterization (e.g., Evans et al, 2006;Oh and Lee, 2011). The quality and accuracy of the DEMs used and their suitability for these applications were not adequately assessed.…”
Section: Introductionmentioning
confidence: 99%
“…This is despite the fact that DEMs such as those from SRTM and ASTER are being used as major sources of topographic information for many applications including hydrological analysis and simulations (e.g., Jaranilla-Sanchez et al, 2011;Santillan et al, 2011;Sarmiento et al, 2012;Clutario and David, 2014;Chen and Senarath, 2014), flood modelling and hazard mapping (e.g., Abon et al, 2011;Ignacio and Henry, 2013), geological hazard analysis (e.g., Lagmay et al, 2012), and landslide mapping characterization (e.g., Evans et al, 2006;Oh and Lee, 2011). The quality and accuracy of the DEMs used and their suitability for these applications were not adequately assessed.…”
Section: Introductionmentioning
confidence: 99%
“…Although numerous studies have been carried out for accuracy assessments of DEMs in different parts of the world using various kinds of reference data and reference DEMs (e.g., Arefi and Reinartz, 2011;Hirt et al, 2010;Gomez, et al, 2012;Li et al, 2013;Athmania and Achour, 2014;Suwandana et al, 2014;Jing et al, 2014;Ioannidis et al, 2014;Satge et al, 2015), very few * Corresponding author have been conducted in the Philippines (e.g., Fabila and Paringit, 2012;Meneses III, 2013). This is despite the fact that DEMs such as those from SRTM and ASTER are being used as major sources of topographic information for many applications including hydrological analysis and simulations (e.g., Jaranilla-Sanchez et al, 2011;Santillan et al, 2011;Sarmiento et al, 2012;Clutario and David, 2014;Chen and Senarath, 2014), flood modelling and hazard mapping (e.g., Abon et al, 2011;Ignacio and Henry, 2013), geological hazard analysis (e.g., Lagmay et al, 2012), and landslide mapping characterization (e.g., Evans et al, 2006;Oh and Lee, 2011). The quality and accuracy of the DEMs used and their suitability for these applications were not adequately assessed.…”
Section: Introductionmentioning
confidence: 99%
“…Natib, exposing it to volcanic hazards. Whereas Venida and Reyes [52] provided justifications for the safety of BNPP's location, Lagmay et al [53] have also published evidence that the BNPP's location is unsafe as it is exposed to geological hazards. Yet in an interview for their systematic study using electrical resistivity, seismic refraction and radon gas detection, Arcilla et al [54] claimed that there are no active faults that lie beneath the BNPP.…”
Section: Environmental Barriersmentioning
confidence: 99%
“…Previous research suggests that the BNPP has general hazard concerns, such as its proximity to the potentially active volcano, Mt. Natib, which is aligned with the Lubao Fault whose traces have high radon emissions [53]. Alternatively, the sub-region of Cagayan in Northern Luzon is deemed a promising site for an NPP in the Philippines.…”
Section: Selection Of Potential Sitementioning
confidence: 99%