In the past decade, the operators and service companies are seeking an integration solution which combines engineering and geology. Since our drilling wells are becoming much more challenging than ever before, it requires the office engineer not only understanding well construction knowledge but also need learn more about geology to help them address the unexpected scenarios may happen to the wells. Then a novel solution should be provided to help engineers understanding their wells better and easier in engineering and geology aspects. The digital twin technology is used to generate a suppositional subsurface world which contains downhole schematic and nearby formation characteristics. This world is described in 3D modelling engineers could read all the information they need after dealt with a unique algorithm engine. In this digital twin subsurface world, the engineering information like well trajectory, casing program, BHA (bottom hole assembly) status, are combined with geology data like formation lithology, layer distribution and coring samples. Both drilling or completion engineers and geologist could get an intuitive awareness of current downhole scenarios and discuss in a more efficient way. The system has been deployed in a major operator in China this year and received lot of valuable feedback from end user. First of all, the system brings solid benefits to operator's supervisors and engineers to help them relate the engineering challenges with according geology information, in this way the judgement and decision are made more reliable and efficiently, also the solution or proposal could be provided more targeted and available. Beyond, the geology information from nearby wells in digital twin modelling could also provide an intuitional navigation or guidance to under-constructed wells avoid any possible tough layers via adjusting drilling parameters. This digital twin system breaks the barrier between well construction engineers and geologists, revealing a fictive downhole world which is based on the knowledge and insight of our industry, providing the engineers necessary information to support their judgement and assumption at very first time when they meet downhole problems. For example, drilling engineers would pay extra attention to control the ROP (rate of penetration) while drilling ahead to fault layer at the first time it is displayed in digital twin system, which prevent potential downhole accident and avoid related NPT (non-production time). The integration of engineering and geology is a must-do task for operators and service companies to improve their performance and reduce downhole risks. Also, it provides an interdisciplinary information to end user for their better awareness and understanding of their downhole asset. Not only help to avoid some possible downhole risks but also benefit on preventing damage reservoir by optimizing the well construction parameters.