2020
DOI: 10.1016/j.autcon.2020.103211
|View full text |Cite
|
Sign up to set email alerts
|

Georeferencing in the context of building information modelling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
22
0
4

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
4
1

Relationship

1
8

Authors

Journals

citations
Cited by 24 publications
(26 citation statements)
references
References 27 publications
0
22
0
4
Order By: Relevance
“…However, properly georeferencing an IFC file makes it possible to link the (local) coordinates inside an IFC model with the corresponding coordinates of the real-world location, and thus to place the model of a single building or construction within its planned context, related to other existing and planned objects and any relevant environmental factors. For this reason, more and more studies address the need for georeferencing BIM and storing such information in the IFC files themselves [28][29][30], including by a buildingSMART working group (https://www.buildingsmart.org/wp-content/uploads /2020/02/User-Guide-for-Geo-referencing-in-IFC-v2.0.pdf, accessed on 1 March 2021).…”
Section: Ifc Georeferencingmentioning
confidence: 99%
“…However, properly georeferencing an IFC file makes it possible to link the (local) coordinates inside an IFC model with the corresponding coordinates of the real-world location, and thus to place the model of a single building or construction within its planned context, related to other existing and planned objects and any relevant environmental factors. For this reason, more and more studies address the need for georeferencing BIM and storing such information in the IFC files themselves [28][29][30], including by a buildingSMART working group (https://www.buildingsmart.org/wp-content/uploads /2020/02/User-Guide-for-Geo-referencing-in-IFC-v2.0.pdf, accessed on 1 March 2021).…”
Section: Ifc Georeferencingmentioning
confidence: 99%
“…For large, elongated structures, more comprehensive geodetic assessments may have to be made. For this, (Jaud et al, 2020) provide a very good overview.…”
Section: Ifcsitementioning
confidence: 99%
“…3conversion) Re-project to the coordinate and height system prescribed by the data requirements. Techniques can vary based on the kind of data being georeferenced (Noardo et al, 2016;Uggla, Horemuz, 2018;Jaud et al, 2020).…”
Section: Harmonization Of the Geometrymentioning
confidence: 99%