2018
DOI: 10.1002/cepa.761
|View full text |Cite
|
Sign up to set email alerts
|

Geotechnical conditions for construction of bank revetment on the Sava amphitheatre area in Belgrade ‐ Serbia

Abstract: Within the project „Belgrade Waterfront”, regulation of the Sava River was predicted, which included the construction of a new bank revetment in a length of about 1800 m. In order to determine the existing situation and to make geotechnical maps for the new bank revetment, geotechnical investigations were performed during 2015. The paper presents the results of these investigations and the defining method of geotechnical models used for the stability analysis of the revetment depending on the extreme hydrologi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 3 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?