2019
DOI: 10.36487/acg_rep/1915_18_de_graaf
|View full text |Cite
|
Sign up to set email alerts
|

Geotechnical risk management for open pit mine closure: a sub-arctic and semi-arid case study

Abstract: De Beers is currently developing closure plans for two open pit mines. At first glance they appear quite similar; both are relatively remote, have operated for 10 years, have similar pit dimensions (250-300 m deep and 1.5 km wide) and have Palaeozoic sedimentary host lithologies with weak upper units overlying more competent lower materials. However, Victor Mine in the sub-Arctic Canada, is one of De Beers wettest mines (dewatering volume of 75,000 m 3 /d) and is hosted predominantly in good quality limestone … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 7 publications
(3 citation statements)
references
References 1 publication
0
3
0
Order By: Relevance
“…Even though there are numerous methods and methodologies for risk assessment [12,13,41,42], improving or simplifying them or developing new ones represents a step forward in science and is a special challenge. The proposed methodology was based on four important steps and some essential sub-steps as shown in Figure 6.…”
Section: A Simplified Failure Risk Assessment Methodologymentioning
confidence: 99%
See 1 more Smart Citation
“…Even though there are numerous methods and methodologies for risk assessment [12,13,41,42], improving or simplifying them or developing new ones represents a step forward in science and is a special challenge. The proposed methodology was based on four important steps and some essential sub-steps as shown in Figure 6.…”
Section: A Simplified Failure Risk Assessment Methodologymentioning
confidence: 99%
“…Studies conducted on failure risk of the final slopes of former open-pits in case of flooding are increasingly common [4,[12][13][14]. Prospective analyses have the role of highlighting areas with failure potential.…”
Section: Introductionmentioning
confidence: 99%
“…Victor Mine is a northern Canada example of this process (de Graaf et al, 2019). Pit lakes and hydrogeological conditions are site-specific, and these conditions require investigation in the context of the stability workplan.…”
Section: Hydrogeology and Pit Lakesmentioning
confidence: 99%