Middle East Oil, Gas and Geosciences Show 2023
DOI: 10.2118/213520-ms
|View full text |Cite
|
Sign up to set email alerts
|

Global First 18.625 and 13.375-in Level-2 Casing-While-Drilling Successful Deployment through Open-Hole and Cased-Hole Sidetracked Wellbores to Isolate Severe Unstable Zones

Abstract: During non-productive time (NPT) such as stuck pipe incidents, reducing the operational time and associated cost of the trouble mitigation should always be the goal. Therefore, the engineering team searched for new and innovative ways to reduce the NPT when stuck pipe incidents happen, and successfully utilized an existing technology in a new way not yet performed on a global basis. In seldom incidents drilling or tripping through unstable zones (especially when drilling through sticky shales an… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 4 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?