The 1st International Online Conference on Infrastructures 2022
DOI: 10.3390/engproc2022017007
|View full text |Cite
|
Sign up to set email alerts
|

Graph-Based Version Control of BIM Models in an Event-Driven Collaboration Environment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 3 publications
0
1
0
Order By: Relevance
“…The integration between 3D survey and BIM has allowed the opening of a research field which is known today as the scan-to-BIM process, where HBIM models are more and more accurate and oriented to the built heritage (HBIM), have led to semantic digital representation forms with high levels of detail (LOD) and information (LOI) [22][23][24][25]. In recent years, we have increasingly seen how technological developments and applied research are increasingly directing professionals to update themselves in their daily practices, exponentially changing the way of designing and managing heritage buildings, infrastructure or archaeological sites from their first design phase to their construction and management over time [26].…”
Section: State-of-the-artmentioning
confidence: 99%
“…The integration between 3D survey and BIM has allowed the opening of a research field which is known today as the scan-to-BIM process, where HBIM models are more and more accurate and oriented to the built heritage (HBIM), have led to semantic digital representation forms with high levels of detail (LOD) and information (LOI) [22][23][24][25]. In recent years, we have increasingly seen how technological developments and applied research are increasingly directing professionals to update themselves in their daily practices, exponentially changing the way of designing and managing heritage buildings, infrastructure or archaeological sites from their first design phase to their construction and management over time [26].…”
Section: State-of-the-artmentioning
confidence: 99%