2021
DOI: 10.21608/jpme.2021.64773.1074
|View full text |Cite
|
Sign up to set email alerts
|

Gravel Packing Sand Control Technique, Case Study, Belayim field, Gulf of Suez, Egypt

Abstract: Sand production is always a challenge for oil production companies worldwide. Several factors can cause sand production, poor cementing material in the reservoir rock, high production rates which cause high draw down result in an unstable zone. The studied field is Belayim field consists of 105 wells; 90 of these wells are oil producing wells, 11 are water injection wells, two wells are dump flood wells, and two wells are water source wells.The main target was to perform a gravel pack job on a high permeabilit… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 8 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?