2020
DOI: 10.1680/jcien.20.00017
|View full text |Cite
|
Sign up to set email alerts
|

Great Western railway electrification, UK: foundations for overhead line equipment

Abstract: Electrification of the Great Western railway between London and south Wales in the UK required the design and installation of 13 000 individual foundations for overhead line equipment along 650 km of live railway tracks. A key design requirement was to provide a simple method of allocating large volumes of foundations while providing a robust design for the wide range of ground conditions, topographies and loading regimes. This paper summarises the key geotechnical design considerations and the basis of design… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 2 publications
0
0
0
Order By: Relevance